Upgraded all network infrastructure across four buildings, including installing new OM4 fiber, building new server cabinets, and setting up MDF (Main Distribution Frame) build-outs to improve data management and connectivity.
Completed various network enhancements across multiple locations. This included installing new packline stations, IDF cabinets, wireless access points, and supervisor stations to improve efficiency, connectivity, and workflow across all facilities.
Made network improvements at multiple sites by adding new packline stations, wireless access points, supervisor stations, and return stations, ensuring each facility operates with enhanced connectivity and smooth workflow.
Installed a new entire network for a new facility from the ground up. This included installing structured Cat 6 cabling, OM3 fiber to connect new IDFs, building out the MDF, setting up wireless networks, configuring security camera systems, and implementing communication systems throughout the facility to ensure seamless operations.
Installed the network infrastructure to support Locus Robotics systems across multiple client locations. This involved setting up wireless access points and fiber connections to ensure seamless integration and data flow for warehouse robotics.
Carried out extensive network modifications to support the company’s growth. This involved adding new packline stations, installing additional data lines, optimizing wireless connectivity, and potentially expanding security camera coverage to maintain smooth and secure operations.